Projects

Our current, ongoing and completed work can be found across the world.

Coastal Resilience

2015-2017

Nearshore Surveys for Various Installations within the Mid-Atlantic Region

Virginia

Through an iterative process, final survey locations were established at a variety of intertidal and subtidal sites and our team of experts conducted seasonal surveys for each of the identified parameters.

Read More

2015-2017

Possum Point Shoreline Restoration, Naval Support Activity (NSA)

Annapolis, Maryland

This ecological restoration project will control erosion, enhance habitat, and improve water quality. Water quality benefits are achieved through stormwater pollutant load reductions—eliminating 113.8 pounds of nitrogen, 103.2 pounds of phosphorus, and 207,829 pounds of sediment from entering the Chesapeake Bay each year.

Read More

2015-2018

Biazzi Stream Restoration and Wetland Creation at Naval Support Facility

Indian Head, Maryland

This project presented the opportunity to accomplish the full cycle of services to support an ecological restoration project from concept to design, permitting to construction, and finally through to delivery. This successful project restored 250 linear feet of stream channel and created two small seasonal pools that are providing water quality and wildlife habitat benefits.

Read More

More Projects

2013 - 2019

Fort Bliss Military Reservation

Texas and New Mexico

Natural Resource Project Support on Fort Bliss Military Reservation.

Read More

2012 - 2020

AFCEC

Hanscom Air Force Base, Massachusetts

Sites 1, 2, and 3 In Situ Chemical Oxidation/Enhanced Reductive Dechlorination (ISCO/ERD) Injection Program at Operable Unit 1 (OU-1).

Read More

2012 - present

Anne Arundel County

Anne Arundel County, Maryland

IDIQ contract to provide monitoring and other programmatic support services to Anne Arundel County Department of Public Works in support of meeting their National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) discharge permit requirements.

Read More

2012 - 2018

EPA Region 4

Sanford, FL

Sanford Dry Cleaners, Remedial Investigation/Feasibility Study, Remedial Design, and Remediation Action Construction Oversight.

Read More
Federal Law Enforcement

2015 - 2020

Federal Law Enforcement Customer

Greater Metropolitan DC Area

Versar remains on the leading edge in protecting facilities, people and technology assets from bad actors seeking to cause disruption to mission-critical systems and programs.

Read More

2016 - present

Harford County

Harford County, Maryland

Provide Environmental Assessment services to Harford County, Maryland, supporting the County's National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System (MS4) permit.

Read More
Wardak Brigade HQ, Afghan

2017

US Army Corps of Engineers, Middle East District (USACE-TAM)

Afghanistan

Versar’s 500 Engineers, Managers, and Professionals provided construction phase support services under nine task orders for all USACE projects in Afghanistan at over 550 construction projects, US military bases, Afghan National Army Bases, and Afghan National Police Bases totaling over $4 Billion in construction value.

Read More

1974 - present

Maryland Department of Natural Resources, Power Plant Research Program

Annapolis, MD

Environmental Studies; Chemical Sampling and Analysis; Preliminary Site; Assessment; Mitigation/Ecosystem Restoration; Multi-agency Regulatory Review; Project Assessment Reports.

Read More

2019

USACE-TAM

Kuwait Naval Base, Kuwait

USACE-TAM CPSS project Task Order 28 scope included construction phase support services including demolishing, renovating, and re-constructing the pier, breakwater, control tower, and harbor and, management support for the US and Kuwait Navies.

Read More